  • 1985 – Demolition of the Rivière-Verte school
    Demolition, waste removal, backfilling, spreading and compacting.

  • 1992 – Edmundston Border Crossing
    Demolition, waste removal, digging for foundation, installation of sewer system, backfilling and preparing parking lot for asphalting.

  • 1994 –Saint-Basile Arena parking lot
    Surface water and preparing parking lot for asphalting.

  • 1998 – Village of Kedgwick
    Extension of water and sewer system.

  • 1999 – Rendez-Vous Chrysler Edmundston
    Digging for foundation, sewer system, backfilling and preparing parking lot for asphalting.

  • 2002 – Town of Saint-Léonard
    Connection of the underground water supply network.

  • 2002 – Water and sewer project Verret – Phase 2
    Storm sewer system/water and sewer infrastructure.

  • 2002 – G.M. Chevrolet Edmundston
    Digging for foundation, sewer system, backfilling and preparing parking lot for asphalting.

  • 2002 – École Régionale in Saint-Basile
    Digging for foundation, storm sewer system, backfilling and preparing parking lot for asphalting.

  • 2002 – Zellers in Saint-Basile (extension)
    Digging for foundation, sewer system and preparing parking lot for asphalting.

  • 2004 – Water and sewer project Saint-Basile – Phase 1
    Storm system/water and sewer infrastructure, preparing sidewalk and street for asphalting.

  • 2005 – Water and sewer project Saint-Basile – Phase 2
    Storm sewer system/water and sewer infrastructure, preparing sidewalk and street for asphalting.

  • 2005 – Comfort Inn Edmundston (extension)
    Digging for foundation, storm sewer system, preparing parking lot for asphalting.

  • 2005 –Claredy Development Saint-Basile – Phase 1